Venue: 2012 Aquatics Centre
Commission: Architectural Review & On Site Supervision
Sport Concepts was commissioned by the Olympic
Delivery Authority to undertake a client
representative role for the UK Government in the
development of the new London 2012 Aquatics
Centre.
During the Games the venue hosted 15,000
spectators in two temporary seating stands. In legacy,
the capacity of the venue was reduced to 2,500
spectators.
Work included an architectural review during the
design phase with regard to aesthetic, operational,
technical and safety aspects of the Zaha Hadid
design.
In addition, Sport Concepts was commissioned to
provide on site supervision of the project during
construction. This included a full time on site
presence to monitor construction quality.
The venue is now successfully operating in its Legacy
configuration.